Difference between revisions of "Run Planning Meeting Notes, November 4 - November 10, 2021"
From GlueXWiki
(→Friday November 05) |
(→Friday November 05) |
||
Line 7: | Line 7: | ||
#* Beam restored around 2pm | #* Beam restored around 2pm | ||
#* Trigger studies with 20nA and 100nA (Sasha) | #* Trigger studies with 20nA and 100nA (Sasha) | ||
− | #* Recorded 150M+ events with full | + | #* Recorded 150M+ events with full lHe4 target |
#* PrimEx EoR | #* PrimEx EoR | ||
#Issues: | #Issues: |
Revision as of 15:36, 4 November 2021
MCC whiteboard Meeting Bluejeans 660743227 Trigger Counter
Friday November 05
- Last 24h:
- Long accelerator down time due to power outage
- Beam restored around 2pm
- Trigger studies with 20nA and 100nA (Sasha)
- Recorded 150M+ events with full lHe4 target
- PrimEx EoR
- Issues:
- Plan:
- Beam energy change planned for 11/05-11/07, start Friday ~7am
- Cancel shifts from Friday 10am?
- RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
- Safety Walkthrough scheduled for Friday 2pm (Elton)
- Installation of Youri's detector near the PS on Sunday, calorimeter test has to go today?
- Start SRC/CT experiment on Monday
- Wiki page
- Morning meeting at same time, but new number: 497773790/1473
- Do we want to start a new run period 2021-11?
- Continue SRC/CT run plan discussion here
- Beam energy change planned for 11/05-11/07, start Friday ~7am
Thursday November 04
- Last 24h:
- Issues:
- CDC HV alarm at 2:45am, restored by itself for all but one channel (F:14), but HV OK, acknowledged
- BCAL LED trigger script was off for runs 81702 and 82703. Switched on afterwards.
- Plan:
- Continue production at 200nA with the solenoid on
- Beam energy change planned for 11/05-11/07, start Friday ~7am
- Cancel shifts from Friday 10am?
- RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
- Safety Walkthrough scheduled for Friday 2pm (Elton)
- EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am