Difference between revisions of "Run Planning Meeting Notes, November 4 - November 10, 2021"
From GlueXWiki
(→Thursday November 04) |
(→Thursday November 04) |
||
Line 6: | Line 6: | ||
#* Maintenance day | #* Maintenance day | ||
#* Replaced FCAL 15 bases [https://logbooks.jlab.org/entry/3936381] | #* Replaced FCAL 15 bases [https://logbooks.jlab.org/entry/3936381] | ||
− | #* Restored beam at | + | #* Restored beam at 11:00pm |
− | #* Harp scan | + | #* Harp scan [https://logbooks.jlab.org/entry/3936722] |
− | #* Recorded | + | #* Recorded 150M+ events with full LHe4 target |
+ | #* Several beam interruptions, currently loss of power, might take a few hours to restore | ||
#Issues: | #Issues: | ||
+ | #* CDC HV alarm at 2:45am, restored by itself for all put '''one'' channel (F:14), but HV OK, acknowledged | ||
+ | #* BCAL LED trigger script was off for runs 81702 and 82703. Switched on. | ||
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | # [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
− | #* Continue production at 200nA with the solenoid on | + | #* Continue production at 200nA with the solenoid on |
− | + | ||
#** Controlled access planned for maintenance work (e.g. FCAL [https://logbooks.jlab.org/entry/3935581]) | #** Controlled access planned for maintenance work (e.g. FCAL [https://logbooks.jlab.org/entry/3935581]) | ||
− | #* Beam energy change planned for 11/05-11/07 | + | #* Beam energy change planned for 11/05-11/07, start Friday ~7am |
− | #** RadCon survey for Friday morning is requested, leave hall in controlled, | + | #** RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall? |
#** Safety Walkthrough scheduled for Friday 2pm | #** Safety Walkthrough scheduled for Friday 2pm | ||
#** EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am | #** EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am |
Revision as of 08:15, 4 November 2021
MCC whiteboard Meeting Bluejeans 660743227 Trigger Counter
Thursday November 04
- Last 24h:
- Issues:
- CDC HV alarm at 2:45am, restored by itself for all put 'one channel (F:14), but HV OK, acknowledged
- BCAL LED trigger script was off for runs 81702 and 82703. Switched on.
- Plan:
- Continue production at 200nA with the solenoid on
- Controlled access planned for maintenance work (e.g. FCAL [3])
- Beam energy change planned for 11/05-11/07, start Friday ~7am
- RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
- Safety Walkthrough scheduled for Friday 2pm
- EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am
- Continue production at 200nA with the solenoid on