Run Planning Meeting Notes, November 24 - November 30, 2022

From GlueXWiki
Revision as of 21:39, 23 November 2022 by Njarvis (Talk | contribs) (Created page with "Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394) [https://cebaf.j...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Our next planned meeting is on Monday Nov 28

The plan

  • Continue production running at 200nA with a full target until further notice (after the weekend).

Achievements

  • Production running with full target.
  • Filled the target on Wednesday morning after approximately 2B triggers with empty target.
  • Raw mode cosmics run (Beni)
  • FCAL bases changed (Malte)

Issues

  • Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.


Shift Summaries

Wed 23 Nov day Wed 23 Nov swing