=== The plan ===
 
* Make an access to replace the 2 bad fadcs (BCAL and FDC).
 
* Continue production running at 200nA with a empty target until further notice, most probably on Wednesday. 1.2B triggers as of Tues 7:30am
 
* HA down until estimated 9pm, HB down, HC reconfiguring until tomorrow swing
 
  
 
=== Updates from the last 24h ===
 
=== Updates from the last 24h ===
 
 
* Emptied the target on Monday morning.
 
* Emptied the target on Monday morning.
* 6am this morning BCAL fadc problems, [https://logbooks.jlab.org/entry/4092925 excluded from daq] will be replaced later, along with FDC fadc roc 53/FDC3 slot 10
+
* Smooth running until 6am this morning BCAL fadc problems [https://logbooks.jlab.org/entry/4092925 excluded from daq]  
 +
* No maintenance scheduled from MCC.  HA down until estimated 9pm tonight, HB down, HC reconfiguring until tomorrow swing. The cavity with 0 field will be brought back online today.
  
 
=== Issues ===
 
=== Issues ===
Line 26: Line 21:
 
* Run 111666 [https://logbooks.jlab.org/entry/4092900 Trigger bit 1 histo empty]
 
* Run 111666 [https://logbooks.jlab.org/entry/4092900 Trigger bit 1 histo empty]
 
* Run 111666 [https://logbooks.jlab.org/entry/4092902 BCAL bad fadc][https://logbooks.jlab.org/files/2022/11/4092897/rs_page01.png hot stripe] [https://logbooks.jlab.org/files/2022/11/4092897/rs_page07.png dead cell 510ish]
 
* Run 111666 [https://logbooks.jlab.org/entry/4092902 BCAL bad fadc][https://logbooks.jlab.org/files/2022/11/4092897/rs_page01.png hot stripe] [https://logbooks.jlab.org/files/2022/11/4092897/rs_page07.png dead cell 510ish]
* [https://logbooks.jlab.org/entry/4092911 FDC fadc issue with raw mode readout from roc 53]  rocid 53 (ROC FDC3) slot 10
+
* [https://logbooks.jlab.org/entry/4092911 FDC fadc issue with raw mode readout from roc 53]   
 +
 
 +
=== The plan ===
 +
* Make an access to replace the 2 bad fadcs - BCAL N1-3-MID slot 4 and ROCFDC3 (rocid 53) slot 10.
 +
* Continue production running at 200nA with empty target until further notice. 1.2B triggers as of Tues 7:30am
  
 
=== Shift Summaries ===
 
=== Shift Summaries ===

Revision as of 09:29, 29 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Tuesday Nov 29

Updates from the last 24h

  • Emptied the target on Monday morning.
  • Smooth running until 6am this morning BCAL fadc problems excluded from daq
  • No maintenance scheduled from MCC. HA down until estimated 9pm tonight, HB down, HC reconfiguring until tomorrow swing. The cavity with 0 field will be brought back online today.

Issues

The plan

  • Make an access to replace the 2 bad fadcs - BCAL N1-3-MID slot 4 and ROCFDC3 (rocid 53) slot 10.
  • Continue production running at 200nA with empty target until further notice. 1.2B triggers as of Tues 7:30am

Shift Summaries

Monday Nov 28

The plan

Achievements

  • Production running with full target, 15B triggers this cycle (Monday 8am)
  • Filled the target on Wednesday morning after approximately 2B triggers with empty target.
  • Raw mode cosmics run 111571 (Beni)
  • FCAL base changed (Malte)
  • Several locked up FCAL bases reset Wed early riser Wed day Fri early riser
  • The top alcohol bubbler has been filled.
  • The empty Ar cylinder has been swapped out.

Issues

Drama (closed issues)

  • Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.
  • Monday 1am - NFS disk errors caused multiple DAQ problems. Sergey was called in.
  • Monday 2:30am CCAL HV unit D2-8_MID lost communication, reported 0 V restored after access to reboot

Shift Summaries