=== The plan ===
 
=== The plan ===
 
* Continue production running at 200nA with a full target until Monday daytime
 
* Continue production running at 200nA with a full target until Monday daytime
* Plans from MCC: A & B down for 24h
+
* Plans from MCC: A off for 24h, B down, C doing target change until Wed swing probably
 
* '''[https://logbooks.jlab.org/entry/4091493 Note that MCC will be doing operator training during owl shifts until Dec 2]'''
 
* '''[https://logbooks.jlab.org/entry/4091493 Note that MCC will be doing operator training during owl shifts until Dec 2]'''
  

Revision as of 08:52, 28 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Monday Nov 28

The plan

Achievements

  • Production running with full target, 10.3B triggers as of Saturday 10pm
  • Filled the target on Wednesday morning after approximately 2B triggers with empty target.
  • Raw mode cosmics run 111571 (Beni)
  • FCAL base changed (Malte)
  • Several locked up FCAL bases reset Wed early riser Wed day Fri early riser

Issues

Drama (closed issues)

  • Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.
  • Monday 1am - NFS disk errors caused multiple DAQ problems. Sergey was called in.
  • Monday 2:30am CCAL HV unit D2-8_MID lost communication, reported 0 V restored after access to reboot