Difference between revisions of "Run Planning Meeting Notes, November 24 - November 30, 2022"

From GlueXWiki
Jump to: navigation, search
(The plan)
(Drama)
Line 25: Line 25:
 
=== Drama ===
 
=== Drama ===
 
* Wednesday pm - cooling water outage [https://logbooks.jlab.org/entry/4089930 summary] and [https://logbooks.jlab.org/entry/4089879 more stripcharts].  We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.
 
* Wednesday pm - cooling water outage [https://logbooks.jlab.org/entry/4089930 summary] and [https://logbooks.jlab.org/entry/4089879 more stripcharts].  We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.
 +
* Monday 1am - multiple electronics problems, started with DAQ errors, then CCAL HV unit
  
 
=== Issues ===
 
=== Issues ===

Revision as of 04:13, 28 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Monday Nov 28

The plan

Achievements

  • Production running with full target, 10.3B triggers as of Saturday 10pm
  • Filled the target on Wednesday morning after approximately 2B triggers with empty target.
  • Raw mode cosmics run 111571 (Beni)
  • FCAL base changed (Malte)
  • Several locked up FCAL bases reset Wed early riser Wed day Fri early riser

Drama

  • Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.
  • Monday 1am - multiple electronics problems, started with DAQ errors, then CCAL HV unit

Issues


Shift Summaries