(The plan)
(The plan)
Line 13: Line 13:
 
=== The plan ===
 
=== The plan ===
 
* Continue production running at 200nA with a full target until further notice (after the weekend).
 
* Continue production running at 200nA with a full target until further notice (after the weekend).
* Note that MCC are doing [https://logbooks.jlab.org/entry/4091493 operator training during owl shifts until Dec 2]
+
* Note that MCC will be doing [https://logbooks.jlab.org/entry/4091493 operator training during owl shifts until Dec 2]
  
 
=== Achievements ===
 
=== Achievements ===

Revision as of 09:41, 26 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Our next planned meeting is on Monday Nov 28

The plan

Achievements

  • Production running with full target, 7.0B triggers as of Friday 8pm
  • Filled the target on Wednesday morning after approximately 2B triggers with empty target.
  • Raw mode cosmics run 111571 (Beni)
  • FCAL base changed (Malte)
  • Several locked up FCAL bases reset Wed early riser Wed day Fri early riser

Issues

Drama

  • Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.

Shift Summaries