Difference between revisions of "Run Planning Meeting Notes, November 24 - November 30, 2022"

From GlueXWiki
Jump to: navigation, search
(Achievements)
(Issues)
Line 25: Line 25:
 
* [https://logbooks.jlab.org/entry/4090024 One Ar cylinder is empty]
 
* [https://logbooks.jlab.org/entry/4090024 One Ar cylinder is empty]
 
* [https://logbooks.jlab.org/entry/4090130 Reconstructed Beam Energy monitoring plot discrepancy in recent runs] (Drew)
 
* [https://logbooks.jlab.org/entry/4090130 Reconstructed Beam Energy monitoring plot discrepancy in recent runs] (Drew)
 +
* The top alcohol bubbler is approaching the Add line.
  
 
=== Drama ===
 
=== Drama ===

Revision as of 21:27, 25 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Our next planned meeting is on Monday Nov 28

The plan

  • Continue production running at 200nA with a full target until further notice (after the weekend).

Achievements

  • Production running with full target, 7.0B triggers as of Friday 8pm
  • Filled the target on Wednesday morning after approximately 2B triggers with empty target.
  • Raw mode cosmics run 111571 (Beni)
  • FCAL base changed (Malte)
  • Several locked up FCAL bases reset Wed early riser Wed day Fri early riser

Issues

Drama

  • Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.

Shift Summaries