Difference between revisions of "Run Planning Meeting Notes, November 24 - November 30, 2022"
From GlueXWiki
(→Issues) |
(→Shift Summaries) |
||
Line 29: | Line 29: | ||
=== Shift Summaries === | === Shift Summaries === | ||
+ | |||
+ | * Wednesday pm - cooling water outage [https://logbooks.jlab.org/entry/4089930 summary] and [https://logbooks.jlab.org/entry/4089879 more stripcharts]. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal. | ||
*[https://logbooks.jlab.org/entry/4089726 Wed 23 Nov day] | *[https://logbooks.jlab.org/entry/4089726 Wed 23 Nov day] | ||
*[https://logbooks.jlab.org/entry/4089880 Wed 23 Nov swing] | *[https://logbooks.jlab.org/entry/4089880 Wed 23 Nov swing] | ||
+ | *[https://logbooks.jlab.org/entry/4090044 Wed 23 Nov owl] [https://logbooks.jlab.org/entry/4090065 remote owl] | ||
+ | *[https://logbooks.jlab.org/entry/4090246 Thu 24 Nov early riser] |
Revision as of 08:22, 24 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Our next planned meeting is on Monday Nov 28
The plan
- Continue production running at 200nA with a full target until further notice (after the weekend).
Achievements
- Production running with full target.
- Filled the target on Wednesday morning after approximately 2B triggers with empty target.
- Raw mode cosmics run 111571 (Beni)
- FCAL base changed (Malte)
- Several locked up FCAL bases reset Wed early riser Wed day
Issues
- Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.