(Shift Summaries)
(Achievements)
Line 18: Line 18:
 
* Production running with full target.
 
* Production running with full target.
 
* Filled the target on Wednesday morning after approximately 2B triggers with empty target.
 
* Filled the target on Wednesday morning after approximately 2B triggers with empty target.
* Raw mode cosmics run (Beni)  
+
* Raw mode cosmics run 111571 (Beni)  
* FCAL bases changed (Malte)
+
* [https://logbooks.jlab.org/entry/4089926 FCAL base changed] (Malte)
  
 
=== Issues ===
 
=== Issues ===

Revision as of 21:42, 23 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Our next planned meeting is on Monday Nov 28

The plan

  • Continue production running at 200nA with a full target until further notice (after the weekend).

Achievements

  • Production running with full target.
  • Filled the target on Wednesday morning after approximately 2B triggers with empty target.
  • Raw mode cosmics run 111571 (Beni)
  • FCAL base changed (Malte)

Issues

  • Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.


Shift Summaries