Difference between revisions of "Run Planning Meeting Notes, Nov 8-Nov 14, 2018"
From GlueXWiki
(→Thursday, Nov 8 at 08:45) |
|||
Line 12: | Line 12: | ||
== Thursday, Nov 8 at 08:45 == | == Thursday, Nov 8 at 08:45 == | ||
#Last 24h: | #Last 24h: | ||
+ | #* TAC run with empty target, v-wire at 50nA, reduced field in PS (400A), low E TAGH counters on | ||
+ | #* Beam tuning | ||
+ | #* Data taking with reduced PS field, coherent edge at 7GeV | ||
#Issues | #Issues | ||
+ | #* PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki | ||
+ | #* beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced | ||
#Reports | #Reports | ||
#*Monitoring | #*Monitoring | ||
# Plans | # Plans | ||
#Notes | #Notes |
Revision as of 17:14, 7 November 2018
<- Back to Run Coordination Meetings:Fall2018 Run
- Trigger graphs
- Trigger Spreadsheet
- Run Plan Google Calendar
- Accel. Plan Google Calendar
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 8
- Hall D schedule for week 9
Thursday, Nov 8 at 08:45
- Last 24h:
- TAC run with empty target, v-wire at 50nA, reduced field in PS (400A), low E TAGH counters on
- Beam tuning
- Data taking with reduced PS field, coherent edge at 7GeV
- Issues
- PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
- beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
- Reports
- Monitoring
- Plans
- Notes