Difference between revisions of "Run Planning Meeting Notes, Nov 29-Dec 6, 2018"
From GlueXWiki
(Created page with "== Wednesday, Nov 28 at 8:45 == # Cryo #* solenoid gobbled up another ~450l LHe #* still no peep from the level probe #* continue today to fill in more # Comp Cal installation...") |
(→Wednesday, Nov 28 at 8:45) |
||
Line 1: | Line 1: | ||
== Wednesday, Nov 28 at 8:45 == | == Wednesday, Nov 28 at 8:45 == | ||
# Cryo | # Cryo | ||
− | #* solenoid | + | #* solenoid helium fill test this morning |
− | + | ||
− | + | ||
# Comp Cal installation | # Comp Cal installation | ||
− | #* | + | #* Completed at 6pm yesterday |
− | # | + | # First sight of beam (by Comp Cal) |
− | + | Swing and Overnight Running | |
− | #* | + | #* 15 nA on Al V-wire. |
− | + | #* Lost beam around 2pm (due to radiation damaged valve position sensor). | |
− | #* | + | # FCAL is down: |
− | # | + | #* Rapid access is arrange between 10am - noon. |
− | + | # Run Plan: | |
− | #* | + | #* [https://halldweb.jlab.org/wiki/images/c/ca/Fall18_week13.jpg Week13] |
− | # | + | #* Second Energy change will take about 48 hours |
− | # | + | |
− | # | + | |
− | + | ||
− | + |
Revision as of 09:27, 30 November 2018
Wednesday, Nov 28 at 8:45
- Cryo
- solenoid helium fill test this morning
- Comp Cal installation
- Completed at 6pm yesterday
- First sight of beam (by Comp Cal)
Swing and Overnight Running
- 15 nA on Al V-wire.
- Lost beam around 2pm (due to radiation damaged valve position sensor).
- FCAL is down:
- Rapid access is arrange between 10am - noon.
- Run Plan:
- Week13
- Second Energy change will take about 48 hours