Difference between revisions of "Run Planning Meeting Notes, May 2-May 6, 2018"
From GlueXWiki
(→Saturday, May 5 at 08:45 (no meeting)) |
(→Saturday, May 5 at 08:45 (no meeting)) |
||
Line 8: | Line 8: | ||
== Saturday, May 5 at 08:45 (no meeting) == | == Saturday, May 5 at 08:45 (no meeting) == | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
− | #* Raster scan [https://halldweb.jlab.org/rcdb/runs/info/42515 #042515] [https://logbooks.jlab.org/entry/3572133] [https://logbooks.jlab.org/entry/3572143] [https://logbooks.jlab.org/entry/3572147] | + | #* Raster scan [https://halldweb.jlab.org/rcdb/runs/info/42515 #042515] [https://logbooks.jlab.org/entry/3572133] [https://logbooks.jlab.org/entry/3572143] [https://logbooks.jlab.org/entry/3572147] [https://logbooks.jlab.org/entry/3572324] |
#* TAC run | #* TAC run | ||
#Issues: | #Issues: |
Revision as of 15:18, 4 May 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Saturday, May 5 at 08:45 (no meeting)
- Notes from the previous 24 hours:
- Issues:
- RootSpy plots do not appear on plot browser
- Reports:
- Run Plan
- AOB
Friday, May 4 at 08:45
- Notes from the previous 24 hours:
- Issues:
- DAQ not starting, needed reboot of rocTRIG2
- MCC corrected beam position on AC
- RootSpy not starting, xMsg server reset [12]
- Reports:
- Run Plan
- Friday
- Fast raster scan (9am, 60min)
- TAC run (10am, 1 shift)
- Saturday
- Production
- Sunday
- 5am end of physics, 6am end of run, restricted access from 10am
- Week 17
- Friday
- AOB