Difference between revisions of "Run Planning Meeting Notes, May 2-May 6, 2018"

From GlueXWiki
Jump to: navigation, search
(Friday, May 4 at 08:45)
Line 18: Line 18:
 
#* MCC corrected beam position on AC
 
#* MCC corrected beam position on AC
 
#* RootSpy not starting, xMsg server reset [https://logbooks.jlab.org/entry/3571692]
 
#* RootSpy not starting, xMsg server reset [https://logbooks.jlab.org/entry/3571692]
#* R. Jones midified gains on AC
 
#** chatting on bluejeans
 
 
#* Transmition rate: [https://logbooks.jlab.org/entry/3571958]
 
 
# Reports:
 
# Reports:
 
#* Effect of W-foil on CDC hit multiplicity [https://logbooks.jlab.org/entry/3571349]
 
#* Effect of W-foil on CDC hit multiplicity [https://logbooks.jlab.org/entry/3571349]
 
#* ω yields w/o W foil [https://logbooks.jlab.org/entry/3571417]
 
#* ω yields w/o W foil [https://logbooks.jlab.org/entry/3571417]
 +
#* R. Jones tested gain setting on AC
 +
#* Transmission rate: [https://logbooks.jlab.org/entry/3571958]
 
# Run Plan
 
# Run Plan
 
#*Friday
 
#*Friday

Revision as of 09:23, 4 May 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Friday, May 4 at 08:45

  1. Notes from the previous 24 hours:
    • Network problems on accelerator site, CHL1 trip, RF recovery, Hall A pass change
    • 1h cosmic run
    • CW beam back at 9pm
    • Harp Scan [1], [2], [3], [4], [5]
    • Raw mode run 42511
    • Production running: 0.8B triggers
  2. Issues:
    • DAQ not starting, needed reboot of rocTRIG2
    • MCC corrected beam position on AC
    • RootSpy not starting, xMsg server reset [6]
  3. Reports:
    • Effect of W-foil on CDC hit multiplicity [7]
    • ω yields w/o W foil [8]
    • R. Jones tested gain setting on AC
    • Transmission rate: [9]
  4. Run Plan
    • Friday
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run, restricted access from 10am
    • Week 17
  5. AOB

Thursday, May 3 at 08:45

  1. Notes from the previous 24 hours:
    • RF Recovery and Tour: scheduled from 9:00-15:00, but RF recovery estimated until 17:00
    • Planned Hall A pass change (several h)
    • Network problems on accelerator site: [10][11][12]
    • Harp Scan
    • Production running
  2. Issues:
  3. Reports:
    • ρ yields w/o W foil: [13]
  4. Run Plan
    • Thursday/Friday
      • Raw mode run
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run
    • Week 17
  5. AOB