Difference between revisions of "Run Planning Meeting Notes, May 2-May 6, 2018"

From GlueXWiki
Jump to: navigation, search
(Friday, May 4 at 08:45)
(Friday, May 4 at 08:45)
Line 10: Line 10:
 
#* Network problems on accelerator site, CHL1 trip, RF recovery, Hall A pass change
 
#* Network problems on accelerator site, CHL1 trip, RF recovery, Hall A pass change
 
#* CW beam back at 9pm
 
#* CW beam back at 9pm
#* Harp Scan
+
#* Harp Scan [https://logbooks.jlab.org/entry/3571611], [https://logbooks.jlab.org/entry/3571616], [https://logbooks.jlab.org/entry/3571631], [https://logbooks.jlab.org/entry/3571632], [https://logbooks.jlab.org/entry/3571634]
 
#* Raw mode run
 
#* Raw mode run
 
#* Production running
 
#* Production running
 
#Issues:
 
#Issues:
 
# Reports:
 
# Reports:
 +
#* Effect of W-foil on CDC hit multiplicity [https://logbooks.jlab.org/entry/3571349]
 
#* ω yields w/o W foil [https://logbooks.jlab.org/entry/3571417]
 
#* ω yields w/o W foil [https://logbooks.jlab.org/entry/3571417]
 
# Run Plan
 
# Run Plan

Revision as of 22:27, 3 May 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Friday, May 4 at 08:45

  1. Notes from the previous 24 hours:
    • Network problems on accelerator site, CHL1 trip, RF recovery, Hall A pass change
    • CW beam back at 9pm
    • Harp Scan [1], [2], [3], [4], [5]
    • Raw mode run
    • Production running
  2. Issues:
  3. Reports:
    • Effect of W-foil on CDC hit multiplicity [6]
    • ω yields w/o W foil [7]
  4. Run Plan
    • Friday
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run, restricted access from 10am
    • Week 17
  5. AOB

Thursday, May 3 at 08:45

  1. Notes from the previous 24 hours:
    • RF Recovery and Tour: scheduled from 9:00-15:00, but RF recovery estimated until 17:00
    • Planned Hall A pass change (several h)
    • Network problems on accelerator site: [8][9][10]
    • Harp Scan
    • Production running
  2. Issues:
  3. Reports:
    • ρ yields w/o W foil: [11]
  4. Run Plan
    • Thursday/Friday
      • Raw mode run
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run
    • Week 17
  5. AOB