Difference between revisions of "Run Planning Meeting Notes, May 2-May 6, 2018"
From GlueXWiki
(→Thursday, May 3 at 08:45) |
(→Thursday, May 3 at 08:45) |
||
Line 8: | Line 8: | ||
== Thursday, May 3 at 08:45 == | == Thursday, May 3 at 08:45 == | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
− | #* RF Recovery and Tour: scheduled from 9:00-15:00 but RF recovery | + | #* RF Recovery and Tour: scheduled from 9:00-15:00, but RF recovery estimated until 17:00 |
− | #* Hall A pass change (several h) | + | #* Planned Hall A pass change (several h) |
− | #* Network problems on accelerator site: [https://logbooks.jlab.org/entry/3571038] | + | #* Network problems on accelerator site: [https://logbooks.jlab.org/entry/3571038][https://logbooks.jlab.org/entry/3571121][https://logbooks.jlab.org/entry/3571169] |
− | #* Harp Scan | + | #* <strike>Harp Scan</strike> |
− | #* Production running | + | #* <strike>Production running</strike> |
#Issues: | #Issues: | ||
# Reports: | # Reports: |
Revision as of 06:46, 3 May 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, May 3 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- Run Plan
- Thursday
- Fast raster scan (9am, 60min)
- TAC run (10am, 1 shift)
- Friday
- Production
- Saturday
- Production
- Sunday
- 5am end of physics, 6am end of run
- Week 17
- Thursday
- AOB