Friday March 10

Past 24 hours

DAQ issue with live time drop to 0%, Surgey reset gluon01 crate to resolve the issue.

Shift Reports

Reports

Issues

  • TPOL alarms
  • DAQ live time 0%, restart did not solve, SURGEY had to reset gluon01 crate: solved(shift crew will be watchful if it reappears)
  • Active collimator: alarms to EPICS (Lubomir and Hovanes to communicate for TPOL card(1/2))

Plans

  • Opportunistic Access by Zisis/Karthik for mini BCAL prototype
  • TAC run (next week?): 1) energy measurement at HallC 2) Bleedthrough measurement at HallD and if HallC run low current or down 2 hours at least, Ssasha will do TAC run, Hall C run co-ordinator will look and communicate if that is the case.

Regular Production Cycle

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)


Thursday March 9

Past 24 hours

  • Work on Injector(early day shift): completed, beam restored.
  • HI test(900nA) Pb and Mo foils, HI study completed at the end of day shift and nominal production conditions restored including AC gain 10^-8
  • Production resumed at swing shift with AMO radiator configuration
  • Rate Scan study by Sasha: Swing shift, raw and production mode at different currents:300nA, 350nA and 400nA
  • Production resumed with 0/90 PARA after Sasha's rate scan completion
  • Beam off due to 1L09 tripping high voltage(~1.5hr)
  • Beam (trippy) early owl shift, then better beam, then beam current was fluctuating and was under 300 nA
  • ABU=11.28 hr(till 12 am), ~2 bn production triggers till 5 am, smooth running over the night

Shift Reports

Reports

Issues

  • TPOL alarms
  • DAQ issue this morning: live time dropped to 0%, restarting solved the issue

Plans

  • TAC run whenever opportunity comes( HallC run at small current or down)

Regular Production Cycle

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)