Run Planning Meeting Notes, March 8 - March 15, 2023

From GlueXWiki
Revision as of 00:15, 9 March 2023 by Churaman (Talk | contribs)

Jump to: navigation, search

Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394

MCC Whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Hall D Logbook



Thursday March 9

Past 24 hours

  • Work on Injector(early day shift): completed, beam restored.
  • HI test(900nA) Pb and Mo foils, HI study completed at the end of day shift and nominal production conditions restored including AC gain 10^-8
  • Production resumed at swing shift with AMO radiator configuration
  • Rate Scan study by Sasha: Swing shift, raw and production mode at different currents:300nA, 350nA and 400nA
  • Production resumed with 0/90 PARA after Sasha's rate scan completion
  • Beam off due to 1L09 tripping high voltage(~1.5hr)
  • ABU=X.X hr

Shift Reports

Reports

Issues

Plans

  • TAC run whenever opportunity comes( HallC run at small current or down)

Regular Production Cycle

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)