Run Planning Meeting Notes, March 8 - March 15, 2023

From GlueXWiki
Revision as of 18:22, 8 March 2023 by Churaman (Talk | contribs)

Jump to: navigation, search

Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394

MCC Whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Hall D Logbook



Thursday March 9

Past 24 hours

Work on Injector(early day shift), HI test  Pb and Mo foils, Production? ABU=? hr

Shift Reports

Reports


Issues

Plans

  • HI test continues with Pb and Mo foils[March 8 day shift], resume production after the HI test(~1 hr once 900 nA beam resumes).
  • TAC run whenever opportunity comes( HallC are running at small current or down)

Regular Production Cycle

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)