Difference between revisions of "Run Planning Meeting Notes, March 8 - March 15, 2023"

From GlueXWiki
Jump to: navigation, search
Line 45: Line 45:
 
*[https://logbooks.jlab.org/entry/4145755 FCAL Base Lockup]
 
*[https://logbooks.jlab.org/entry/4145755 FCAL Base Lockup]
 
*[https://logbooks.jlab.org/entry/4145810 Beam Current over the night] (Jesse)
 
*[https://logbooks.jlab.org/entry/4145810 Beam Current over the night] (Jesse)
*[https://logbooks.jlab.org/entry/4145807 TPOL occupancies not flat before reset rootspy](Yannik)
+
*[https://logbooks.jlab.org/entry/4145807 TPOL occupancies not flat before reset of rootspy](Yannik)
 
=== Issues ===
 
=== Issues ===
 
*[https://logbooks.jlab.org/entry/4144945 TPOL alarms]
 
*[https://logbooks.jlab.org/entry/4144945 TPOL alarms]

Revision as of 07:47, 9 March 2023

Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394

MCC Whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Hall D Logbook




Thursday March 9

Past 24 hours

  • Work on Injector(early day shift): completed, beam restored.
  • HI test(900nA) Pb and Mo foils, HI study completed at the end of day shift and nominal production conditions restored including AC gain 10^-8
  • Production resumed at swing shift with AMO radiator configuration
  • Rate Scan study by Sasha: Swing shift, raw and production mode at different currents:300nA, 350nA and 400nA
  • Production resumed with 0/90 PARA after Sasha's rate scan completion
  • Beam off due to 1L09 tripping high voltage(~1.5hr)
  • Beam (trippy) early owl shift, then better beam, then beam current was fluctuating and was under 300 nA
  • ABU=5.48 hr(till 12 am), ~2 bn production triggers till 5 am

Shift Reports

Reports

Issues

Plans

  • TAC run whenever opportunity comes( HallC run at small current or down)

Regular Production Cycle

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)