Difference between revisions of "Run Planning Meeting Notes, March 8 - March 15, 2023"

From GlueXWiki
Jump to: navigation, search
Line 34: Line 34:
 
*[https://logbooks.jlab.org/entry/4145132 High intensity test with Pb and Mo foils](Justin)
 
*[https://logbooks.jlab.org/entry/4145132 High intensity test with Pb and Mo foils](Justin)
 
*[https://logbooks.jlab.org/entry/4145087] [https://logbooks.jlab.org/entry/4145141] Pb and  Molybdenum foil inserted](Lubomir)
 
*[https://logbooks.jlab.org/entry/4145087] [https://logbooks.jlab.org/entry/4145141] Pb and  Molybdenum foil inserted](Lubomir)
*[https://logbooks.jlab.org/entry/4145215] Doubled the thickness of the Molybdenum (Lubomir)
+
*[https://logbooks.jlab.org/entry/4145215 Doubled the thickness of the Molybdenum] (Lubomir)
 
*[https://logbooks.jlab.org/entry/4145094] [https://logbooks.jlab.org/entry/4145147] CDC currents with W and W+Pb foils (Naomi)
 
*[https://logbooks.jlab.org/entry/4145094] [https://logbooks.jlab.org/entry/4145147] CDC currents with W and W+Pb foils (Naomi)
 
*[https://logbooks.jlab.org/entry/4145194 CDC currents with W and Mo foils] (Naomi)
 
*[https://logbooks.jlab.org/entry/4145194 CDC currents with W and Mo foils] (Naomi)

Revision as of 21:41, 8 March 2023

Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394

MCC Whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Hall D Logbook



Thursday March 9

Past 24 hours

  • Work on Injector(early day shift): completed, beam restored.
  • HI test Pb and Mo foils, HI study completed at the end of day shift and nominal production conditions restored including AC gain 10^-8
  • Production resumed at swing shift with AMO radiator configuration
  • Rate Scan study by Sasha: Swing shift
  • Production resumed with 0/90 PARA after Sasha's rate scan completion
  • ABU=X.X hr

Shift Reports

Reports

Issues

Plans

  • TAC run whenever opportunity comes( HallC run at small current or down)

Regular Production Cycle

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)