Difference between revisions of "Run Planning Meeting Notes, March 8 - March 15, 2023"

From GlueXWiki
Jump to: navigation, search
Line 28: Line 28:
 
*[https://logbooks.jlab.org/entry/4145132 High intensity test with Pb and Mo foils](Justin)
 
*[https://logbooks.jlab.org/entry/4145132 High intensity test with Pb and Mo foils](Justin)
 
*[https://logbooks.jlab.org/entry/4145087] [https://logbooks.jlab.org/entry/4145141] Pb and  Molybdenum foil inserted](Lubomir)
 
*[https://logbooks.jlab.org/entry/4145087] [https://logbooks.jlab.org/entry/4145141] Pb and  Molybdenum foil inserted](Lubomir)
 +
*[https://logbooks.jlab.org/entry/4145215] Doubled the thickness of the Molybdenum (Lubomir)
 
*[https://logbooks.jlab.org/entry/4145094] [https://logbooks.jlab.org/entry/4145147] CDC currents with W and W+Pb foils (Naomi)
 
*[https://logbooks.jlab.org/entry/4145094] [https://logbooks.jlab.org/entry/4145147] CDC currents with W and W+Pb foils (Naomi)
 
*[https://logbooks.jlab.org/entry/4145194] CDC currents with W and Mo foils (Naomi)
 
*[https://logbooks.jlab.org/entry/4145194] CDC currents with W and Mo foils (Naomi)

Revision as of 15:53, 8 March 2023

Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394

MCC Whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Hall D Logbook



Thursday March 9

Past 24 hours

Work on Injector(early day shift), HI test  Pb and Mo foils, Production? ABU=? hr

Shift Reports

  • [ Early Riser Shift Summary]
  • Day Shift Summary
  • [ Swing Shift Summary]
  • [ Owl Shift Summary]

Reports

Issues

Plans

  • HI test continues with Pb and Mo foils[March 8 day shift], resume production after the HI test

Regular Production Cycle

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)