Difference between revisions of "Run Planning Meeting Notes, March 8 - March 15, 2023"
From GlueXWiki
Line 28: | Line 28: | ||
*[https://logbooks.jlab.org/entry/4145132 High intensity test with Pb and Mo foils](Justin) | *[https://logbooks.jlab.org/entry/4145132 High intensity test with Pb and Mo foils](Justin) | ||
*[https://logbooks.jlab.org/entry/4145087] [https://logbooks.jlab.org/entry/4145141] Pb and Molybdenum foil inserted](Lubomir) | *[https://logbooks.jlab.org/entry/4145087] [https://logbooks.jlab.org/entry/4145141] Pb and Molybdenum foil inserted](Lubomir) | ||
− | *[https://logbooks.jlab.org/entry/4145094][https://logbooks.jlab.org/entry/4145147] | + | *[https://logbooks.jlab.org/entry/4145094] [https://logbooks.jlab.org/entry/4145147] CDC currents with W and W+Pb foils (Naomi) |
+ | *[https://logbooks.jlab.org/entry/4145194] CDC currents with W and Mo foils (Naomi) | ||
=== Issues === | === Issues === |
Revision as of 13:28, 8 March 2023
Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Thursday March 9
Past 24 hours
Work on Injector(early day shift), HI test Pb and Mo foils, Production? ABU=? hr
Shift Reports
- [ Early Riser Shift Summary]
- Day Shift Summary
- [ Swing Shift Summary]
- [ Owl Shift Summary]
Reports
- High intensity test with Pb and Mo foils(Justin)
- [1] [2] Pb and Molybdenum foil inserted](Lubomir)
- [3] [4] CDC currents with W and W+Pb foils (Naomi)
- [5] CDC currents with W and Mo foils (Naomi)
Issues
Plans
- HI test continues with Pb and Mo foils
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)