Difference between revisions of "Run Planning Meeting Notes, March 8 - March 15, 2023"
From GlueXWiki
Line 27: | Line 27: | ||
=== Reports === | === Reports === | ||
*[https://logbooks.jlab.org/entry/4145132 High intensity test with Pb and Mo foils](Justin) | *[https://logbooks.jlab.org/entry/4145132 High intensity test with Pb and Mo foils](Justin) | ||
− | *[ | + | *[https://logbooks.jlab.org/entry/4145141 Molybdenum foil inserted](Lubomir) |
*[https://logbooks.jlab.org/entry/4145094 CDC currents with W and W+Pb foils](Naomi) | *[https://logbooks.jlab.org/entry/4145094 CDC currents with W and W+Pb foils](Naomi) | ||
Revision as of 11:43, 8 March 2023
Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Thursday March 9
Past 24 hours
Work on Injector to reduce the trips, work ongoing during day shift(how long?),HI test Pb and Mo foils, Production? ABU=? hr
Shift Reports
- [ Early Riser Shift Summary]
- Day Shift Summary
- [ Swing Shift Summary]
- [ Owl Shift Summary]
Reports
- High intensity test with Pb and Mo foils(Justin)
- Molybdenum foil inserted(Lubomir)
- CDC currents with W and W+Pb foils(Naomi)
Issues
Plans
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)