Difference between revisions of "Run Planning Meeting Notes, March 1 - March 8, 2023"
From GlueXWiki
(→Thursday March 2) |
(→Thursday March 2) |
||
Line 16: | Line 16: | ||
* TAGM work on radiated crates | * TAGM work on radiated crates | ||
* Production runs | * Production runs | ||
+ | * After separate ACC issue beam came back 22:05 or so. Thought we were not reaching Richard so I gave him a call at 22:30 just to make sure. Call is successful and Richard goes ahead and does studies on the TagM gains | ||
=== Shift Reports === | === Shift Reports === | ||
Line 44: | Line 45: | ||
*Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back) | *Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back) | ||
− | |||
*Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance. | *Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance. |
Revision as of 23:39, 1 March 2023
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Thursday March 2
Past 24 hours
- MCC "Maintenance Day"
- TAGM work on radiated crates
- Production runs
- After separate ACC issue beam came back 22:05 or so. Thought we were not reaching Richard so I gave him a call at 22:30 just to make sure. Call is successful and Richard goes ahead and does studies on the TagM gains
Shift Reports
Early Riser Day Swing [ Owl]
Reports
- second atmospheric pressure sensor added (Hovanes)
- 5x5 Sciglass Detector Prototype (Sasha)
- rho yields addressing TagM Issue (Alex)
- CDC AI HV control enabled (David L)
Issues
- Coherent peak
- TAGM tripped off (MCC - Daniel)
Plans
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
- Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back)
- Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance.