Difference between revisions of "Run Planning Meeting Notes, March 1 - March 8, 2023"
From GlueXWiki
(→Past 24 hours) |
(→Thursday March 2) |
||
Line 20: | Line 20: | ||
[https://logbooks.jlab.org/entry/4141055 Early Riser] | [https://logbooks.jlab.org/entry/4141055 Early Riser] | ||
[https://logbooks.jlab.org/entry/4141166 Day] | [https://logbooks.jlab.org/entry/4141166 Day] | ||
− | [ Swing] | + | [https://logbooks.jlab.org/entry/4141486 Swing] |
[ Owl] | [ Owl] | ||
=== Reports === | === Reports === | ||
− | |||
*[https://logbooks.jlab.org/entry/4141163 second atmospheric pressure sensor added] (Hovanes) | *[https://logbooks.jlab.org/entry/4141163 second atmospheric pressure sensor added] (Hovanes) | ||
+ | *[https://logbooks.jlab.org/entry/4141550 5x5 Sciglass Detector Prototype] (Sasha) | ||
+ | *[https://logbooks.jlab.org/entry/4141574 rho yields addressing TagM Issue] (Alex) | ||
+ | *[https://logbooks.jlab.org/entry/4141578 CDC AI HV control enabled] (David L) | ||
+ | |||
=== Issues === | === Issues === | ||
Line 40: | Line 43: | ||
**1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | **1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | ||
− | * | + | *Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back) |
+ | *Richard wants to do a run with specific settings on TAGM to check gains. This was to be set for primetime Wednesday night if beam came back. 1 hr became 4 hr and shift crew failed to reach him. Maybe table to tomorrow | ||
+ | *Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance. |
Revision as of 23:27, 1 March 2023
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Thursday March 2
Past 24 hours
- MCC "Maintenance Day"
- TAGM work on radiated crates
- Production runs
Shift Reports
Early Riser Day Swing [ Owl]
Reports
- second atmospheric pressure sensor added (Hovanes)
- 5x5 Sciglass Detector Prototype (Sasha)
- rho yields addressing TagM Issue (Alex)
- CDC AI HV control enabled (David L)
Issues
- Coherent peak
- TAGM tripped off (MCC - Daniel)
Plans
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
- Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back)
- Richard wants to do a run with specific settings on TAGM to check gains. This was to be set for primetime Wednesday night if beam came back. 1 hr became 4 hr and shift crew failed to reach him. Maybe table to tomorrow
- Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance.