Difference between revisions of "Run Planning Meeting Notes, March 1 - March 8, 2023"
From GlueXWiki
(→Reports) |
|||
Line 25: | Line 25: | ||
=== Reports === | === Reports === | ||
*[https://logbooks.jlab.org/entry/4140983 CCAL check] (Sasha) | *[https://logbooks.jlab.org/entry/4140983 CCAL check] (Sasha) | ||
+ | *[https://logbooks.jlab.org/entry/4141163 second atmospheric pressure sensor added] (Hovanes) | ||
=== Issues === | === Issues === |
Revision as of 17:20, 1 March 2023
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Thursday March 2
Past 24 hours
- MCC "Maintenance Day"
- Production runs
Shift Reports
Early Riser Day [ Swing] [ Owl]
Reports
- CCAL check (Sasha)
- second atmospheric pressure sensor added (Hovanes)
Issues
- TAGM tripped off (MCC - Daniel)
Plans
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
- will we need a harp scan? MCC took away beam quite a while yesterday