Difference between revisions of "Run Planning Meeting Notes, March 1 - March 8, 2023"

From GlueXWiki
Jump to: navigation, search
(Reports)
Line 25: Line 25:
 
=== Reports ===
 
=== Reports ===
 
*[https://logbooks.jlab.org/entry/4140983 CCAL check] (Sasha)
 
*[https://logbooks.jlab.org/entry/4140983 CCAL check] (Sasha)
 +
*[https://logbooks.jlab.org/entry/4141163 second atmospheric pressure sensor added] (Hovanes)
  
 
=== Issues ===
 
=== Issues ===

Revision as of 17:20, 1 March 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count


Thursday March 2

Past 24 hours

  • MCC "Maintenance Day"
  • Production runs

Shift Reports

Early Riser Day [ Swing] [ Owl]

Reports

Issues


Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
  • will we need a harp scan? MCC took away beam quite a while yesterday