Difference between revisions of "Run Planning Meeting Notes, March 15 - March 22, 2023"
From GlueXWiki
(Created page with "[https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 Zoom Connect] Meeting ID: 160 199 0060 / Passcode 8394 [https://cebaf.jlab.org/files/ops/accboa...") |
(→Plans on Accelerator Side) |
||
Line 43: | Line 43: | ||
* Straight-track run ~50nA (Magnetic field off: drift chamber)[March 19th Sunday swing][Justin, Sasha, Lubomir, Naomi][Access not required] | * Straight-track run ~50nA (Magnetic field off: drift chamber)[March 19th Sunday swing][Justin, Sasha, Lubomir, Naomi][Access not required] | ||
==Plans on Accelerator Side== | ==Plans on Accelerator Side== | ||
− | * | + | * Hall C running continues, no apparent issues that might interrupt them before Monday |
===Regular Production Cycle=== | ===Regular Production Cycle=== | ||
*Production (300 nA, 2h runs) with cycle: | *Production (300 nA, 2h runs) with cycle: |
Revision as of 08:36, 16 March 2023
Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394 MCC Whiteboard Hall D counting room white board Spreadsheet with list of runs Integrated Trigger Count Hall D Logbook
Contents
Thursday March 16
Past 24 hours
- Tagger Hall Access (March 15) by Hovanes(After the Hall is surveyed and gets into controlled access)
- High current run(900 nA)[High intensity scan:Final round] with modified trigger thresh-holds[Wednesday swing/Thursday day Shift][Justin, Sasha, Lubomir, Naomi][Access not required]
Shift Reports
Reports
Issues
Plans
- Continue running production
- Visitors tour of Hall D starts at 4:45pm 3/16
- Data collection should end sometime after 4:00pm, when convenient before 4:20
- Contact MCC and ask to drop Hall D to RESTRICTED, tagger hall not affected
- Ask them to contact RADCON to sweep Hall D for the visit
- Visit should end by 6:45pm
- As soon as they leave, put Hall D back in Power Permit and request beam restoration
- Start off with new harp scans, then continue production
- Straight-track run ~50nA (Magnetic field off: drift chamber)[March 19th Sunday swing][Justin, Sasha, Lubomir, Naomi][Access not required]
Plans on Accelerator Side
- Hall C running continues, no apparent issues that might interrupt them before Monday
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 3 runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)