Run Planning Meeting Notes, March 11 - march 15, 2024

From GlueXWiki
Revision as of 07:34, 12 March 2024 by Deurpam (Talk | contribs) (Tuesday, March 12 2024)

Jump to: navigation, search

Tuesday, March 12 2024

Past 24 hours

  • 6:37 LCW fluctuation tripped PS magnet.
  • Hall C pass change completed early afternoon. Then, Ops started to tune hall D beam.
  • 17:30 Ops starting to tune beam to Hall D tagger.
  • 23:30 Although the first amorphous radiator motion was normal, it got stuck in its way to get retracted.
    • Hovanes reduced motor speed to 30% of nominal
    • We decided to drop the program on 10-4 and 3*10-4 RL radiators, as well as Ion Chambers threshold calib. on those. We also drop the plan for our Harp scan since it uses the same motor.
  • 01:05 radiator motion issue again despite reduced speed
  • 03:20 Ion Chamber calibration done (2*10-5 radiator only because of motor issue)
  • 05:20 Active Colimator calibration done (high gain only because of radiator motor issue)



  • ABUs: h

Issues


  • Questions:
    • Access to tagger to look at amorphous radiator/harp motor?
    • Man shifts for Friday day/swing?


Plan