(Friday, March 10)
(Friday, March 10)
Line 76: Line 76:
 
#*** 7kHz physics triggers (BCAL + FCAL) : 200M collected
 
#*** 7kHz physics triggers (BCAL + FCAL) : 200M collected
 
#*** 11kHz minimum-bias triggers (TAGM * ST) : 330M collected
 
#*** 11kHz minimum-bias triggers (TAGM * ST) : 330M collected
# Issues
+
# Beam quality checks
 +
#* harp scans analysis - [https://logbooks.jlab.org/entry/3466802]
 +
#Data quality checks
 +
#*xx
 +
# Record keeping quality
 
# Monitoring
 
# Monitoring
 
#* low-level report
 
#* low-level report

Revision as of 08:33, 10 March 2017

<- Back to Run Coordination Meetings: Spring 2017 Run

Thursday, March 9

Shift ABU BNA BANU
Day 0:40 7:18 0:02
Swing 0:0 8:0 0.0
Owl 0:24 6:55 0:41
Total 1:04 22:13 0:43


  1. Accelerator Status over the last 24 hrs
    • Accelerator busy with Hall C until 05:00
    • Hall D first given beam at 05:20
    • Data collection at 50nA started at 08:00
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • Low-intensity production started at 08:00
      • Long mode run (10 minutes) done at
      • Current Total: 40.05B
  3. Issues
    • DAQ issues:
      • 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
      • ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
  1. Monitoring
    • low-level report
  2. Run Plan
    • Production
    • Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
  3. Offline Analysis
    • TAC runs?
  4. AOB

Friday, March 10

Shift ABU BNA BANU
Day 4:05 3:27 0:27
Swing 5:26 2:32 0:02
Owl
Total


  1. Accelerator Status over the last 24 hrs
    • beam delivery was fairly good (55%) until late evening
    • south linac cold box tripped around 22:30, 4hr recovery estimated
    • recovery was progressing, but tripped again around 03:30
    • MCC estimates ~4hr more at 07:00
  2. Progress with GlueX program in last 24 hours
    • Low-intensity production started at 10:00
      • 1e-4rl amorphous radiator @ 100uA
        • 7kHz physics triggers (BCAL + FCAL) : 200M collected
        • 11kHz minimum-bias triggers (TAGM * ST) : 330M collected
  3. Beam quality checks
    • harp scans analysis - [1]
  4. Data quality checks
    • xx
  5. Record keeping quality
  6. Monitoring
    • low-level report
  7. Run Plan
    • Production
  8. Offline Analysis
    • TAC run
  9. AOB