Difference between revisions of "Run Planning Meeting Notes, Mar 9 - Mar 15, 2017"

From GlueXWiki
Jump to: navigation, search
(Thursday, March 9)
(Thursday, March 9)
Line 15: Line 15:
 
|Day  ||align="center"| 0:40 ||align="center"| 7:18 ||align="center"| 0:02
 
|Day  ||align="center"| 0:40 ||align="center"| 7:18 ||align="center"| 0:02
 
|-
 
|-
|Swing || 0:0 || 8:0 || 0.0
+
|Swing ||align="center"| 0:0 ||align="center"| 8:0 ||align="center"| 0.0
 
|-
 
|-
|Owl  || 0:24 || 6:55 || 0:41
+
|Owl  ||align="center"| 0:24 ||align="center"| 6:55 ||align="center"| 0:41
 
|-
 
|-
|Total || 1:04 || 22:13 || 0:43
+
|Total |||align="center"1:04 |||align="center" 22:13 |||align="center" 0:43
 
|-
 
|-
 
|}
 
|}

Revision as of 08:00, 10 March 2017

<- Back to Run Coordination Meetings: Spring 2017 Run

Thursday, March 9

Shift ABU BNA BANU
Day 0:40 7:18 0:02
Swing 0:0 8:0 0.0
Owl 0:24 6:55 0:41
Total align="center"1:04 align="center" 22:13 align="center" 0:43


  1. Accelerator Status over the last 24 hrs
    • Accelerator busy with Hall C until 05:00
    • Hall D first given beam at 05:20
    • Data collection at 50nA started at 08:00
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • Low-intensity production started at 08:00
      • Long mode run (10 minutes) done at
      • Current Total: 40.05B
  3. Issues
    • DAQ issues:
      • 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
      • ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
  1. Monitoring
    • low-level report
  2. Run Plan
    • Production
    • Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
  3. Offline Analysis
    • TAC runs?
  4. AOB

Friday, March 10

Shift ABU BNA BANU
Day 0:40 7:18 0:02
Swing 0:0 8:0 0.0
Owl 0:24 6:55 0:41
Total 1:04 22:13 0:43


  1. Accelerator Status over the last 24 hrs
    • Accelerator busy with Hall C until 05:00
    • Hall D first given beam at 05:20
    • Data collection at 50nA started at 08:00
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • Low-intensity production started at 08:00
      • Long mode run (10 minutes) done at
      • Current Total: 40.05B
  3. Issues
    • DAQ issues:
      • 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
      • ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
  1. Monitoring
    • low-level report
  2. Run Plan
    • Production
    • Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
  3. Offline Analysis
    • TAC runs?
  4. AOB