Thursday, March 28 at 08:45

  1. Notes from the previous 24 hours:
    • RF separator tested out ok, aimed to restore beam for swing shift but delayed due to CHL issues
    • 0800 MCC meeting notes
  2. Reports:
  3. Run Plan
    • Restablish Photon beam
    • Diamond spot adjustment (Hovanes)
    • CDC Background Studies (Lubomir et al.)
    • PS High Rate Check (Alex S) ? from Sunday's list
    • Converter thickness study (Alex S.)
    • SSP Study (Alex S.)
    • Production running