(Created page with "<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run == Thursday, March 28 at 08:45 == # Notes from the previous 24 hours: #* RF separator tested out ok, aimed to...") |
(→Thursday, March 28 at 08:45) |
||
Line 10: | Line 10: | ||
#* Diamond spot adjustment (Hovanes) | #* Diamond spot adjustment (Hovanes) | ||
#* CDC Background Studies (Lubomir et al.) | #* CDC Background Studies (Lubomir et al.) | ||
− | |||
#* Converter thickness study (Alex S.) | #* Converter thickness study (Alex S.) | ||
#* SSP Study (Alex S.) | #* SSP Study (Alex S.) | ||
#* Production running | #* Production running | ||
# AOB | # AOB |
Revision as of 23:42, 28 March 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, March 28 at 08:45
- Notes from the previous 24 hours:
- RF separator tested out ok, aimed to restore beam for swing shift but delayed due to CHL issues
- 0800 MCC meeting notes
- Reports:
- Run Plan
- Restablish Photon beam
- Diamond spot adjustment (Hovanes)
- CDC Background Studies (Lubomir et al.)
- Converter thickness study (Alex S.)
- SSP Study (Alex S.)
- Production running
- AOB