(Thursday, March 28 at 08:45)
(Thursday, March 28 at 08:45)
Line 5: Line 5:
 
#* RF separator tested out ok, aimed to restore beam for swing shift but delayed due to CHL issues  
 
#* RF separator tested out ok, aimed to restore beam for swing shift but delayed due to CHL issues  
 
#* Beam arrived just before midnight, convergence not good, owl shift spent tuning
 
#* Beam arrived just before midnight, convergence not good, owl shift spent tuning
#* 0800 MCC meeting notes
+
#* 0800 MCC meeting notes - Todd retuning; planning machine work 4h Mon, 8h Tues
 
#Issues:
 
#Issues:
 
#* Shift-takers should at least log any acknowledged alarms so that they are not forgotten
 
#* Shift-takers should at least log any acknowledged alarms so that they are not forgotten

Revision as of 08:35, 29 March 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, March 28 at 08:45

  1. Notes from the previous 24 hours:
    • RF separator tested out ok, aimed to restore beam for swing shift but delayed due to CHL issues
    • Beam arrived just before midnight, convergence not good, owl shift spent tuning
    • 0800 MCC meeting notes - Todd retuning; planning machine work 4h Mon, 8h Tues
  2. Issues:
    • Shift-takers should at least log any acknowledged alarms so that they are not forgotten
    • Is there a how-to page for the BTA sheet? (load from epics, edit etc & guidelines on ABU/BANU)
  3. Reports:
  4. Run Plan
    • Re-establish Photon beam
    • 1h production to check beam quality & detectors
    • Diamond spot adjustment (Hovanes)
    • CDC Background Studies (Lubomir et al.)
    • Converter thickness study (Alex S.)
    • SSP Study (Alex S.)
    • Production running
  5. AOB