Difference between revisions of "Run Planning Meeting Notes, Mar 28 - Apr 3, 2019"

From GlueXWiki
Jump to: navigation, search
m
m
Line 19: Line 19:
 
#Run Plan
 
#Run Plan
 
#* Production running
 
#* Production running
#* Beam studies planned for day shift on Monday
+
#* Accesses(?)
#* RF Recovery scheduled for Tuesday
+
#** Beam studies planned for day shift on Monday
 +
#** RF Recovery scheduled for Tuesday
 
#* Switching back to empty target?
 
#* Switching back to empty target?
 
#* End of run is coming...
 
#* End of run is coming...

Revision as of 18:03, 28 March 2019

Friday, Mar. 29 at 08:45

  1. Past 24 hours:
    • North Linac problems day shift into swing (~3 hours)
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Accesses(?)
      • Beam studies planned for day shift on Monday
      • RF Recovery scheduled for Tuesday
    • Switching back to empty target?
    • End of run is coming...

Thursday, Mar. 28 at 08:45

  1. Past 24 hours:
    • Pass change for hall C
    • Separator issues, 4th and 5th pass
    • Minor drifts in the Active Collimator lock
    • Minor drifts in beam current
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
    • Short interruption by MCC to continue investigation of separator issues from last night
  5. Run Plan
    • Production running
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday
    • Switching back to empty target?