Difference between revisions of "Run Planning Meeting Notes, Mar 28 - Apr 3, 2019"
From GlueXWiki
m |
m |
||
Line 8: | Line 8: | ||
* To join via a Web Browser, go to the page [https://bluejeans.com/660743227 https://bluejeans.com/660743227] | * To join via a Web Browser, go to the page [https://bluejeans.com/660743227 https://bluejeans.com/660743227] | ||
− | == | + | == Friday, Mar. 29 at 08:45 == |
# Past 24 hours: | # Past 24 hours: | ||
− | #* | + | #* North Linac problems day shift into swing (~3 hours) |
− | + | ||
− | + | ||
− | + | ||
# Issues | # Issues | ||
− | #* | + | #* |
− | + | ||
# Reports | # Reports | ||
− | #* | + | #* |
− | + | ||
# Today: | # Today: | ||
#* Production: 200nA, Al 10<sup>-4</sup> | #* Production: 200nA, Al 10<sup>-4</sup> | ||
− | |||
#Run Plan | #Run Plan | ||
#* Production running | #* Production running | ||
Line 28: | Line 22: | ||
#* RF Recovery scheduled for Tuesday | #* RF Recovery scheduled for Tuesday | ||
#* Switching back to empty target? | #* Switching back to empty target? | ||
+ | #* End of run is coming... | ||
− | == | + | == Thursday, Mar. 28 at 08:45 == |
# Past 24 hours: | # Past 24 hours: | ||
− | #* | + | #* Pass change for hall C |
+ | #* Separator issues, 4th and 5th pass | ||
+ | #* Minor drifts in the Active Collimator lock | ||
+ | #* Minor drifts in beam current | ||
# Issues | # Issues | ||
− | #* | + | #*[https://logbooks.jlab.org/entry/3672933 Solenoid Alarms] |
+ | #*[https://logbooks.jlab.org/entry/3672894 CCAL cluster time double peak] | ||
# Reports | # Reports | ||
− | #* | + | #*[https://logbooks.jlab.org/entry/3673138 rate monitoring] |
+ | #*[https://jlab12gev.slack.com/messages/CH44WP0L9 halld_ops slack channel] | ||
# Today: | # Today: | ||
#* Production: 200nA, Al 10<sup>-4</sup> | #* Production: 200nA, Al 10<sup>-4</sup> | ||
+ | #* Short interruption by MCC to continue investigation of separator issues from last night | ||
#Run Plan | #Run Plan | ||
#* Production running | #* Production running | ||
Line 43: | Line 44: | ||
#* RF Recovery scheduled for Tuesday | #* RF Recovery scheduled for Tuesday | ||
#* Switching back to empty target? | #* Switching back to empty target? | ||
− |
Revision as of 17:59, 28 March 2019
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Friday, Mar. 29 at 08:45
- Past 24 hours:
- North Linac problems day shift into swing (~3 hours)
- Issues
- Reports
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
- Switching back to empty target?
- End of run is coming...
Thursday, Mar. 28 at 08:45
- Past 24 hours:
- Pass change for hall C
- Separator issues, 4th and 5th pass
- Minor drifts in the Active Collimator lock
- Minor drifts in beam current
- Issues
- Reports
- Today:
- Production: 200nA, Al 10-4
- Short interruption by MCC to continue investigation of separator issues from last night
- Run Plan
- Production running
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
- Switching back to empty target?