Thursday, Mar. 28 at 08:45

  1. Past 24 hours:
    • Pass change for hall C
    • Separator issues, 4th and 5th pass
    • Minor drifts in the Active Collimator lock
    • Minor drifts in beam current
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
    • Short interruption by MCC to continue investigation of separator issues from last night
  5. Run Plan
    • Production running
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday
    • Switching back to empty target?

Friday, Mar. 29 at 08:45

  1. Past 24 hours:
    • North Linac problems day shift into swing (~3 hours)
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday
    • Switching back to empty target?
    • End of run is coming...