== Friday, Mar. 29 at 08:45 ==
 +
# Past 24 hours:
 +
#*
 +
# Issues
 +
#*
 +
# Reports
 +
#*
 +
# Today:
 +
#* Production: 200nA, Al 10<sup>-4</sup>
 +
#Run Plan
 +
#* Production running
 +
#* Beam studies planned for day shift on Monday
 +
#* RF Recovery scheduled for Tuesday
 +
#* Switching back to empty target?
 +
#* End of run is coming...

Revision as of 11:07, 28 March 2019

Thursday, Mar. 28 at 08:45

  1. Past 24 hours:
    • Pass change for hall C
    • Separator issues, 4th and 5th pass
    • Minor drifts in the Active Collimator lock
    • Minor drifts in beam current
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
    • Short interruption by MCC to continue investigation of separator issues from last night
  5. Run Plan
    • Production running
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday
    • Switching back to empty target?

Friday, Mar. 29 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday
    • Switching back to empty target?
    • End of run is coming...