Difference between revisions of "Run Planning Meeting Notes, Mar 12-Mar 18, 2020"

From GlueXWiki
Jump to: navigation, search
(Wednesday, March 18)
(Wednesday, March 18)
Line 99: Line 99:
 
#**[https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing low-intensity run sequence]
 
#**[https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing low-intensity run sequence]
 
# Reports/Issues
 
# Reports/Issues
 +
#* What to do about BTA reporting, with 8-hour / 6-hour shift boundary mismatch?
 
#* Plan implemented for offsite workers to do regular monitoring, make reports
 
#* Plan implemented for offsite workers to do regular monitoring, make reports
 
#** [https://logbooks.jlab.org/entry/3805457 6:00pm report March 17]
 
#** [https://logbooks.jlab.org/entry/3805457 6:00pm report March 17]
 
# Run Plan
 
# Run Plan
 
#* TAC run -- starting this morning 7:00am
 
#* TAC run -- starting this morning 7:00am

Revision as of 07:20, 18 March 2020

Thursday, March 12

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production

Friday, March 13

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan

For the period starting evening of Tuesday, March 17

Tentative Revised Shift Schedule -- Viral Edition

Monday, March 16

  1. Last 72 hours
  2. Reports/Issues
  3. Run Plan
    • TAC run to be taken opportunistically, when Hall A is down -- Sasha
    • Plan to instrument active collimator with a reference electrode bias -- Richard
    • Tagger microscope intensity scan with diamond radiator requested (1 shift) -- Richard
    • Production
  4. Jlab at MEDCON 5 -- starting tomorrow!

Tuesday, March 17

  1. Jlab at MEDCON 5 -- starting today!
  2. Last 24 hours
  3. Reports/Issues
  4. Run Plan

Tonight's plan for low intensity running

Wednesday, March 18

  1. Single-person shift schedule in operation, since yesterday 16:00
  2. Last 24 hours
  3. Reports/Issues
    • What to do about BTA reporting, with 8-hour / 6-hour shift boundary mismatch?
    • Plan implemented for offsite workers to do regular monitoring, make reports
  4. Run Plan
    • TAC run -- starting this morning 7:00am