Difference between revisions of "Run Planning Meeting Notes, Mar 12-Mar 18, 2020"

From GlueXWiki
Jump to: navigation, search
(Wednesday, March 18)
(Wednesday, March 18)
Line 91: Line 91:
 
# Last 24 hours
 
# Last 24 hours
 
#* BCal pedestal adjustment -- ''completed''
 
#* BCal pedestal adjustment -- ''completed''
 +
#* [https://logbooks.jlab.org/entry/3805407 fire alarm box beeping] -- guidance?
 
#* [https://logbooks.jlab.org/entry/3805338 tagger microscope intensity scan] -- completed, 8 hours
 
#* [https://logbooks.jlab.org/entry/3805338 tagger microscope intensity scan] -- completed, 8 hours
 
#** [[Tagger accidentals rate scan, Fall 2019|Tagger microscope intensity scan with diamond radiator]]
 
#** [[Tagger accidentals rate scan, Fall 2019|Tagger microscope intensity scan with diamond radiator]]
 
#* Low-intensity scans to study reconstruction efficiency dependence on photon intensity -- ''completed''
 
#* Low-intensity scans to study reconstruction efficiency dependence on photon intensity -- ''completed''
#*:[https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing low-intensity run sequence]
+
#**[https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing low-intensity run sequence]
 
# Reports/Issues
 
# Reports/Issues
 
#* ...
 
#* ...
 
# Run Plan
 
# Run Plan
 
#* TAC run -- starting this morning 7:00am
 
#* TAC run -- starting this morning 7:00am

Revision as of 07:10, 18 March 2020

Thursday, March 12

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production

Friday, March 13

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan

For the period starting evening of Tuesday, March 17

Tentative Revised Shift Schedule -- Viral Edition

Monday, March 16

  1. Last 72 hours
  2. Reports/Issues
  3. Run Plan
    • TAC run to be taken opportunistically, when Hall A is down -- Sasha
    • Plan to instrument active collimator with a reference electrode bias -- Richard
    • Tagger microscope intensity scan with diamond radiator requested (1 shift) -- Richard
    • Production
  4. Jlab at MEDCON 5 -- starting tomorrow!

Tuesday, March 17

  1. Jlab at MEDCON 5 -- starting today!
  2. Last 24 hours
  3. Reports/Issues
  4. Run Plan

Tonight's plan for low intensity running

Wednesday, March 18

  1. Single-person shift schedule in operation, since yesterday 16:00
  2. Last 24 hours
  3. Reports/Issues
    • ...
  4. Run Plan
    • TAC run -- starting this morning 7:00am