Difference between revisions of "Run Planning Meeting Notes, Mar 12-Mar 18, 2020"

From GlueXWiki
Jump to: navigation, search
(Tuesday, March 17)
Line 75: Line 75:
 
#* [[Tagger accidentals rate scan, Fall 2019|Tagger microscope intensity scan with diamond radiator]] requested (1 shift) -- Richard
 
#* [[Tagger accidentals rate scan, Fall 2019|Tagger microscope intensity scan with diamond radiator]] requested (1 shift) -- Richard
 
#* Other systematics studies?
 
#* Other systematics studies?
#** Low-intensity scans to study reconstruction efficiency dependence on photon intensity
+
#** Low-intensity scans to study reconstruction efficiency dependence on photon intensity: [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing suggested run plan and list of runs from 2018 scans]
 
#* Building access at MEDCON 5
 
#* Building access at MEDCON 5

Revision as of 14:03, 17 March 2020

Thursday, March 12

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production

Friday, March 13

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan

For the period starting evening of Tuesday, March 17

Tentative Revised Shift Schedule -- Viral Edition

Monday, March 16

  1. Last 72 hours
  2. Reports/Issues
  3. Run Plan
    • TAC run to be taken opportunistically, when Hall A is down -- Sasha
    • Plan to instrument active collimator with a reference electrode bias -- Richard
    • Tagger microscope intensity scan with diamond radiator requested (1 shift) -- Richard
    • Production
  4. Jlab at MEDCON 5 -- starting tomorrow!

Tuesday, March 17

  1. Jlab at MEDCON 5 -- starting today!
  2. Last 24 hours
  3. Reports/Issues
  4. Run Plan