Difference between revisions of "Run Planning Meeting Notes, Mar 12-Mar 18, 2020"

From GlueXWiki
Jump to: navigation, search
(Tuesday, March 17)
(Tuesday, March 17)
Line 70: Line 70:
 
#* [https://logbooks.jlab.org/entry/3805303 Collimator transmission trends update] -- Alexandre
 
#* [https://logbooks.jlab.org/entry/3805303 Collimator transmission trends update] -- Alexandre
 
# Run Plan
 
# Run Plan
 +
#* New BCal pedestal run requested -- Mark
 
#* TAC run planned for Wednesday morning, starting 7:00am when Hall A plans a Moller run -- Sasha
 
#* TAC run planned for Wednesday morning, starting 7:00am when Hall A plans a Moller run -- Sasha
 
#* Plan to instrument active collimator with a reference electrode bias -- Richard
 
#* Plan to instrument active collimator with a reference electrode bias -- Richard

Revision as of 08:34, 17 March 2020

Thursday, March 12

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production

Friday, March 13

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan

For the period starting evening of Tuesday, March 17

Tentative Revised Shift Schedule -- Viral Edition

Monday, March 16

  1. Last 72 hours
  2. Reports/Issues
  3. Run Plan
    • TAC run to be taken opportunistically, when Hall A is down -- Sasha
    • Plan to instrument active collimator with a reference electrode bias -- Richard
    • Tagger microscope intensity scan with diamond radiator requested (1 shift) -- Richard
    • Production
  4. Jlab at MEDCON 5 -- starting tomorrow!

Tuesday, March 17

  1. Jlab at MEDCON 5 -- starting today!
  2. Last 24 hours
  3. Reports/Issues
  4. Run Plan
    • New BCal pedestal run requested -- Mark
    • TAC run planned for Wednesday morning, starting 7:00am when Hall A plans a Moller run -- Sasha
    • Plan to instrument active collimator with a reference electrode bias -- Richard
    • Tagger microscope intensity scan with diamond radiator requested (1 shift) -- Richard
    • Other systematics studies?
    • Building access at MEDCON 5