Difference between revisions of "Run Planning Meeting Notes, Mar 12-Mar 18, 2020"

From GlueXWiki
Jump to: navigation, search
(Tuesday, March 17)
(Tuesday, March 17)
Line 65: Line 65:
 
#* raw mode run 72291 (30 minutes of beam) was taken, then production continued
 
#* raw mode run 72291 (30 minutes of beam) was taken, then production continued
 
# Reports/Issues
 
# Reports/Issues
#* ...
+
#* Notches in TAGM timing histos traced to out-of-date monitoring software?
 
# Run Plan
 
# Run Plan
 
#* TAC run planned for Wednesday morning, starting 8:00am when Hall A plans a Moller run -- Sasha
 
#* TAC run planned for Wednesday morning, starting 8:00am when Hall A plans a Moller run -- Sasha

Revision as of 07:23, 17 March 2020

Thursday, March 12

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production

Friday, March 13

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan

For the period starting evening of Tuesday, March 17

Tentative Revised Shift Schedule -- Viral Edition

Monday, March 16

  1. Last 72 hours
  2. Reports/Issues
  3. Run Plan
    • TAC run to be taken opportunistically, when Hall A is down -- Sasha
    • Plan to instrument active collimator with a reference electrode bias -- Richard
    • Tagger microscope intensity scan with diamond radiator requested (1 shift) -- Richard
    • Production
  4. Jlab at MEDCON 5 -- starting tomorrow!

Tuesday, March 17

  1. Jlab at MEDCON 5 -- starting today!
  2. Last 24 hours
  3. Reports/Issues
    • Notches in TAGM timing histos traced to out-of-date monitoring software?
  4. Run Plan
    • TAC run planned for Wednesday morning, starting 8:00am when Hall A plans a Moller run -- Sasha
    • Plan to instrument active collimator with a reference electrode bias -- Richard
    • Tagger microscope intensity scan with diamond radiator requested (1 shift) -- Richard
    • Other systematics studies?
    • Building access at MEDCON 5