(Monday, March 16)
(Monday, March 16)
Line 38: Line 38:
 
#* threshold scan of TAGH completed -- Sasha
 
#* threshold scan of TAGH completed -- Sasha
 
#* [https://logbooks.jlab.org/entry/3803658 difficulties with DIRC hv, resolved] -- Justin
 
#* [https://logbooks.jlab.org/entry/3803658 difficulties with DIRC hv, resolved] -- Justin
 +
#* [https://logbooks.jlab.org/entry/3803759 drop in collimator transmission by 20%] -- Alexander
 +
#** [https://logbooks.jlab.org/entry/3803783 reduced current tests during transmission dip]
 
# Reports/Issues
 
# Reports/Issues
 
#*  
 
#*  

Revision as of 06:42, 16 March 2020

Thursday, March 12

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production

Friday, March 13

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan

For the period starting evening of Tuesday, March 17

Tentative Revised Shift Schedule -- Viral Edition

Monday, March 16

  1. Last 72 hours
  2. Reports/Issues
  3. Run Plan
    • ...
    • Production