Run Planning Meeting Notes, Mar 1-Mar 7, 2018
From GlueXWiki
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, March 1
- Notes from the previous 24 hours:
- Production Data with 58um JD70-100 diamond in the early afternoon
- At about 6pm, we started low intensity scan see Justin's google sheet
- For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset
- Issues:
- (fixed) Sean updated the CDC timing for the low intensity scan. This has to be switched it back in production (see also this entry).
- Reports (some of these shown at the AWG yesterday):
- Production vertex position before/after collimator shift
- Planning:
- updated run time chart [1]
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan in early morning: ... [enter log entry here]
- ... add itemized list of actions taken