Difference between revisions of "Run Planning Meeting Notes, Mar 1-Mar 7, 2018"
From GlueXWiki
(→Thursday, March 1) |
|||
Line 9: | Line 9: | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
#* Production Data with 58um JD70-100 diamond in the early afternoon | #* Production Data with 58um JD70-100 diamond in the early afternoon | ||
− | #* At about 6pm, we started low intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit#gid=0 | + | #* At about 6pm, we started low intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit#gid=0 as proposed in Justin's google sheet] |
#* For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset | #* For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset | ||
# Issues: | # Issues: | ||
Line 19: | Line 19: | ||
#* updated run time chart [https://halldweb1.jlab.org/wiki/index.php/File:Spring18_week8.jpg] | #* updated run time chart [https://halldweb1.jlab.org/wiki/index.php/File:Spring18_week8.jpg] | ||
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
− | #* Harp scan in early morning | + | #* Harp scan in early morning (?) |
− | + |
Revision as of 00:34, 1 March 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, March 1
- Notes from the previous 24 hours:
- Production Data with 58um JD70-100 diamond in the early afternoon
- At about 6pm, we started low intensity scan as proposed in Justin's google sheet
- For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset
- Issues:
- Reports (some of these shown at the AWG yesterday):
- Production vertex position before/after collimator shift (runs 40496 and 40509) [AA]
- Pedestals Monitor FCAL, BCAL (run 41546 - production) [3] [SF]
- Planning:
- updated run time chart [4]
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan in early morning (?)