Difference between revisions of "Run Planning Meeting Notes, Mar 1-Mar 7, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, March 1)
(Thursday, March 1)
Line 12: Line 12:
 
#* For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset
 
#* For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset
 
# Issues:
 
# Issues:
#* (fixed) Sean updated the CDC timing for the low intensity scan. This has to be switched it back in production (see also this [https://logbooks.jlab.org/entry/3537413 entry]).   
+
#* (fixed) Sean updated the CDC timing for the low intensity scan, see [https://logbooks.jlab.org/entry/3540445]. This has to be switched it back in production (see also this [https://logbooks.jlab.org/entry/3537413 entry]).   
 
# Reports (some of these shown at the AWG yesterday):
 
# Reports (some of these shown at the AWG yesterday):
 
#* Production vertex position [https://logbooks.jlab.org/entry/3540250 before/after collimator shift]
 
#* Production vertex position [https://logbooks.jlab.org/entry/3540250 before/after collimator shift]

Revision as of 21:21, 28 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, March 1

  1. Notes from the previous 24 hours:
    • Production Data with 58um JD70-100 diamond in the early afternoon
    • At about 6pm, we started low intensity scan see Justin's google sheet
    • For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset
  2. Issues:
    • (fixed) Sean updated the CDC timing for the low intensity scan, see [1]. This has to be switched it back in production (see also this entry).
  3. Reports (some of these shown at the AWG yesterday):
  4. Planning:
    • updated run time chart [2]
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan in early morning: ... [enter log entry here]
    • ... add itemized list of actions taken