Difference between revisions of "Run Planning Meeting Notes, July 27-August 5, 2020"

From GlueXWiki
Jump to: navigation, search
m (Aug. 3rd)
(Aug. 3rd)
Line 37: Line 37:
 
[https://logbooks.jlab.org/entry/3819971 Run plan for today]
 
[https://logbooks.jlab.org/entry/3819971 Run plan for today]
  
 +
Tasks completed:
 
*Took 1h "production" (with TagM down) amorphous run.
 
*Took 1h "production" (with TagM down) amorphous run.
 
*[https://logbooks.jlab.org/entry/3820227 Hovanes finalized the optimization of the transmission.] Optimal transmission is obtained for:  
 
*[https://logbooks.jlab.org/entry/3820227 Hovanes finalized the optimization of the transmission.] Optimal transmission is obtained for:  
Line 42: Line 43:
 
**AC: X = 0.8 Y = -0.4  
 
**AC: X = 0.8 Y = -0.4  
 
*[https://logbooks.jlab.org/entry/3820171 TagM fixed after 1:30pm-4:4-pm access]. Sergey and Lubomir worked opportunistically in the Hall on TRD during Tagger access.
 
*[https://logbooks.jlab.org/entry/3820171 TagM fixed after 1:30pm-4:4-pm access]. Sergey and Lubomir worked opportunistically in the Hall on TRD during Tagger access.
 +
*TagM HV scan.
 +
 +
Tasks to be done:
 +
*Hovanes to check JD70-105 diamond alignement
 
*Sacha finalized the trigger check out
 
*Sacha finalized the trigger check out
 +
*One production cycle at 150nA
 +
*Start regular production.
  
 
Issues:
 
Issues:

Revision as of 22:17, 3 August 2020

<- Back to Run coordination meeting page


July 27th-Aug. 2nd

  • Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
  • Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
  • Shift Started on Aug. 1st, 8am.

August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Did two long accesses to tagger, but the problem remains. Due to this, the runplan for August 3-4 has been reorganized

Issues:

Upcoming days:

Aug. 3rd

Run plan for today

Tasks completed:

Tasks to be done:

  • Hovanes to check JD70-105 diamond alignement
  • Sacha finalized the trigger check out
  • One production cycle at 150nA
  • Start regular production.

Issues:

Reports:

Upcoming days: