Difference between revisions of "Run Planning Meeting Notes, July 21- July 27, 2022"

From GlueXWiki
Jump to: navigation, search
(Remove doys from previous week)
(Thursday July 21)
Line 9: Line 9:
 
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
  
 +
 +
 +
= Friday July 22 =
 +
 +
=== Past 24 hours ===
 +
* ROCFDC11 Slot 19 FADC125 (possibly?) repaired
 +
* Solenoid final ramp to 1350 A ~ 5:00 AM
 +
* Beam returns ~ 5:00 AM
 +
* Harp scans
 +
* Start data taking on empty target ~ 6:00 AM
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4017818 Day shift summary ]
 +
* [https://logbooks.jlab.org/entry/4017969 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4018042 Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4018097 Early Riser shift summary]
 +
 +
=== Reports ===
 +
* [https://logbooks.jlab.org/entry/4017837 see etas] Beni
 +
* [https://logbooks.jlab.org/entry/4017922 7 FCAL bases changed] Mark
 +
* [https://logbooks.jlab.org/entry/4017886 Changed CPP chamber gas flow] Tim
 +
* [https://logbooks.jlab.org/entry/4017940 HD solenoid update ] Tim
 +
* [https://logbooks.jlab.org/entry/4017987 Strange solenoid MPS GUI state ] Hovannes
 +
* [https://logbooks.jlab.org/entry/4018099 Solenoid final ramp to 1350 A ] Tim
 +
* [https://logbooks.jlab.org/entry/4018108 Harp scan 5C11]
 +
* [https://logbooks.jlab.org/entry/4018110 Harp scan 5C11B]
 +
* [https://logbooks.jlab.org/entry/4018124 Radiator wire scan ] Hovannes
 +
* [https://gryphn.phys.uconn.edu/halld/cobrems/harptool_2d.cgi?harp5C11_xsigma=1.281&harp5C11_xsigma_err=0.03&harp5C11_usigma=0.8745&harp5C11_usigma_err=0.03&harp5C11_ysigma=0.6953&harp5C11_ysigma_err=0.03&harp5C11B_xsigma=1.021&harp5C11B_xsigma_err=0.05&harp5C11B_usigma=0.8057&harp5C11B_usigma_err=0.05&harp5C11B_ysigma=0.6756&harp5C11B_ysigma_err=0.15&radHarp_xsigma=0.982&radHarp_xsigma_err=0.02&radHarp_usigma=0.8169&radHarp_usigma_err=0.02&radHarp_ysigma=0.6105&radHarp_ysigma_err=0.02&harp5C11_spos=102.97&harp5C11B_spos=115.11&emittance_x=0.0041&radHarp_spos=119.7&emittance_y=0.00233&collimator_spos=194.92&fit=fit+and+plot Extrapolations from today’s wire scans] Hovannes
 +
* [https://logbooks.jlab.org/entry/4018146 FCAL hit local time looks weird] Ksuresh
 +
* [https://logbooks.jlab.org/entry/4018153 Trigger plots for the run don’t match reference ] Ksuresh
 +
* [https://logbooks.jlab.org/entry/4018163 BCAL hot channel?] Ksuresh
 +
 +
=== Plans ===
 +
* Continue data taking on empty target
  
  

Revision as of 13:56, 21 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs


Friday July 22

Past 24 hours

  • ROCFDC11 Slot 19 FADC125 (possibly?) repaired
  • Solenoid final ramp to 1350 A ~ 5:00 AM
  • Beam returns ~ 5:00 AM
  • Harp scans
  • Start data taking on empty target ~ 6:00 AM

Shift Reports

Reports

Plans

  • Continue data taking on empty target


Thursday July 21

Past 24 hours

  • ROCFDC11 Slot 19 FADC125 (possibly?) repaired
  • Solenoid final ramp to 1350 A ~ 5:00 AM
  • Beam returns ~ 5:00 AM
  • Harp scans
  • Start data taking on empty target ~ 6:00 AM

Shift Reports

Reports

Plans

  • Continue data taking on empty target