[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
  
 +
= Wednesday July 27 =
  
 +
=== Past 24 hours ===
 +
* The accelerator went offline at 5:30 PM Tuesday due to a power glitch to CEBAF. The Tagger and PS magnets tripped off. Waiting for issues with a RF zone and a bulk power supply to be resolved
 +
* Data taking on Pb target, approx 1.0 B triggers in the past 24 hours
  
= Friday July 22 =
+
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4020157 Day shift summary ]
 +
* [https://logbooks.jlab.org/entry/4020263 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4020412 Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4020460 Early Riser shift summary]
 +
 
 +
=== Reports ===
 +
 
 +
* [https://logbooks.jlab.org/entry/4019951 CDC HV trip] Hovannes
 +
 
 +
=== Plans ===
 +
* When beam returns take harp scans, then resume data taking on Pb full target
 +
* Thursday day shift is scheduled for beam studies, beam in the accelerator but not to the halls.  This would be a good time to work on the CTOF PMT#3
 +
 
 +
= Tuesday July 26 =
  
 
=== Past 24 hours ===  
 
=== Past 24 hours ===  
* ROCFDC11 Slot 19 FADC125 (possibly?) repaired
+
* Switched to Pb target around 10:30 AM Monday
* Solenoid final ramp to 1350 A ~ 5:00 AM
+
* Data taking on Pb target, approx 2.8 B triggers in the past 24 hours
* Beam returns ~ 5:00 AM
+
* Harp scans
+
* Start data taking on empty target ~ 6:00 AM
+
  
 
=== Shift Reports ===
 
=== Shift Reports ===
* [https://logbooks.jlab.org/entry/4017818 Day shift summary ]
+
* [https://logbooks.jlab.org/entry/4019718 Day shift summary ]
* [https://logbooks.jlab.org/entry/4017969 Swing shift summary]
+
* [https://logbooks.jlab.org/entry/4019819 Swing shift summary]
* [https://logbooks.jlab.org/entry/4018042 Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4019921 Owl shift summary]
* [https://logbooks.jlab.org/entry/4018097 Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4020034 Early Riser shift summary]
  
 
=== Reports ===
 
=== Reports ===
* [https://logbooks.jlab.org/entry/4017837 see etas] Beni
+
 
* [https://logbooks.jlab.org/entry/4017922 7 FCAL bases changed] Mark
+
* [https://logbooks.jlab.org/entry/4019750 Lead target installed] Ilya
* [https://logbooks.jlab.org/entry/4017886 Changed CPP chamber gas flow] Tim
+
* [https://logbooks.jlab.org/entry/4019951 Occasional CDC HV trips]
* [https://logbooks.jlab.org/entry/4017940 HD solenoid update ] Tim
+
* [https://logbooks.jlab.org/entry/4017987 Strange solenoid MPS GUI state ] Hovannes
+
* [https://logbooks.jlab.org/entry/4018099 Solenoid final ramp to 1350 A ] Tim
+
* [https://logbooks.jlab.org/entry/4018108 Harp scan 5C11]
+
* [https://logbooks.jlab.org/entry/4018110 Harp scan 5C11B]
+
* [https://logbooks.jlab.org/entry/4018124 Radiator wire scan ] Hovannes
+
* [https://gryphn.phys.uconn.edu/halld/cobrems/harptool_2d.cgi?harp5C11_xsigma=1.281&harp5C11_xsigma_err=0.03&harp5C11_usigma=0.8745&harp5C11_usigma_err=0.03&harp5C11_ysigma=0.6953&harp5C11_ysigma_err=0.03&harp5C11B_xsigma=1.021&harp5C11B_xsigma_err=0.05&harp5C11B_usigma=0.8057&harp5C11B_usigma_err=0.05&harp5C11B_ysigma=0.6756&harp5C11B_ysigma_err=0.15&radHarp_xsigma=0.982&radHarp_xsigma_err=0.02&radHarp_usigma=0.8169&radHarp_usigma_err=0.02&radHarp_ysigma=0.6105&radHarp_ysigma_err=0.02&harp5C11_spos=102.97&harp5C11B_spos=115.11&emittance_x=0.0041&radHarp_spos=119.7&emittance_y=0.00233&collimator_spos=194.92&fit=fit+and+plot Extrapolations from today’s wire scans] Hovannes
+
* [https://logbooks.jlab.org/entry/4018146 FCAL hit local time looks weird] Ksuresh
+
* [https://logbooks.jlab.org/entry/4018153 Trigger plots for the run don’t match reference ] Ksuresh
+
* [https://logbooks.jlab.org/entry/4018163 BCAL hot channel?] Ksuresh
+
  
 
=== Plans ===
 
=== Plans ===
* Continue data taking on empty target
+
* Continue taking data on full target
 +
* Next opportunity to repair CTOF PMT #3 is probably Thursday, tentative RF recovery day
  
 +
= Monday July 25 =
 +
 +
=== Past 24 hours ===
 +
* Data taking on empty target, approx 2.7 B triggers in the past 24 hours
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4019380 Day shift summary ]
 +
* [https://logbooks.jlab.org/entry/4019457 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4019548 Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4019620 Early Riser shift summary]
 +
 +
=== Reports ===
 +
 +
* [https://logbooks.jlab.org/entry/4019447 Some TagH scalars are high with no beam] A. Hurley
 +
* [https://logbooks.jlab.org/entry/4019388 Nice clean omega] Beni
 +
 +
=== Plans ===
 +
* Switch to full target running after the RC meeting
 +
 +
 +
= Sunday July 24 =
 +
 +
=== Past 24 hours ===
 +
* Data taking on empty target, approx 2.8 B triggers in the past 24 hours
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4019028 Day shift summary ]
 +
* [https://logbooks.jlab.org/entry/4019130 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4019206 Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4019275 Early Riser shift summary]
 +
 +
=== Reports ===
 +
 +
* [https://logbooks.jlab.org/entry/4019114 3 bases and 1 PMT swapped in FCAL] Mark
 +
* [https://logbooks.jlab.org/entry/4019308 Discriminator problem in rocTAGH2 slot 18] Hovannes
 +
* [https://logbooks.jlab.org/entry/4019304 Tagger hodoscope scalar channels frozen] Thomas
 +
 +
=== Plans ===
 +
* Continue taking data on empty target until Monday morning.
 +
 +
= Saturday July 23 =
 +
 +
=== Past 24 hours ===
 +
* Data taking on empty target, approx 2.7 B triggers in the past 24 hours
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4018602 Day shift summary ]
 +
* [https://logbooks.jlab.org/entry/4018730 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4018841 Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4018917 Early Riser shift summary]
 +
 +
=== Reports ===
 +
 +
*
 +
 +
=== Plans ===
 +
* In discussions Friday after the RC meeting it was decided to continue data taking on empty target until Monday morning. Then switch to full target.
 +
 +
= Friday July 22 =
 +
 +
=== Past 24 hours ===
 +
* Data taking on empty target, approx 2.1 B triggers in the past 24 hours
 +
* Priority for beam delivery shifts to Hall D today
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4018251 Day shift summary ]
 +
* [https://logbooks.jlab.org/entry/4018374 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4018466 Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4018525 Early Riser shift summary]
 +
 +
=== Reports ===
 +
 +
* [https://logbooks.jlab.org/entry/4018249 Followup on backgrounds seen in coherent pi0 photo-production on lead]] Beni
 +
* [https://logbooks.jlab.org/entry/4018256 Updated firmware for fadc250 rocfcal2, slot13]  Sasha
 +
* [https://logbooks.jlab.org/entry/4018261 FCAL Hit Local Time after the fix ]
 +
* [https://logbooks.jlab.org/entry/4018258 Trigger rates with amorphous radiator and empty target] Y. Wolf
 +
* [https://logbooks.jlab.org/entry/4018405 TOF and CTOF trigger rates recorded to EPICS] Sasha
 +
* [https://logbooks.jlab.org/entry/4018538 CTOF paddle 3 PMT tripped] David L.
 +
 +
=== Plans ===
 +
* Continue data taking on empty target until ~ 17:00 today, then switch to full target for running over the weekend
  
 
= Thursday July 21 =
 
= Thursday July 21 =
Line 57: Line 144:
 
* [https://logbooks.jlab.org/entry/4017818 Day shift summary ]
 
* [https://logbooks.jlab.org/entry/4017818 Day shift summary ]
 
* [https://logbooks.jlab.org/entry/4017969 Swing shift summary]
 
* [https://logbooks.jlab.org/entry/4017969 Swing shift summary]
* [https://logbooks.jlab.org/entry/4018042 Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4018466 Owl shift summary]
 
* [https://logbooks.jlab.org/entry/4018097 Early Riser shift summary]
 
* [https://logbooks.jlab.org/entry/4018097 Early Riser shift summary]
  

Latest revision as of 08:17, 27 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Wednesday July 27

Past 24 hours

  • The accelerator went offline at 5:30 PM Tuesday due to a power glitch to CEBAF. The Tagger and PS magnets tripped off. Waiting for issues with a RF zone and a bulk power supply to be resolved
  • Data taking on Pb target, approx 1.0 B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • When beam returns take harp scans, then resume data taking on Pb full target
  • Thursday day shift is scheduled for beam studies, beam in the accelerator but not to the halls. This would be a good time to work on the CTOF PMT#3

Tuesday July 26

Past 24 hours

  • Switched to Pb target around 10:30 AM Monday
  • Data taking on Pb target, approx 2.8 B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • Continue taking data on full target
  • Next opportunity to repair CTOF PMT #3 is probably Thursday, tentative RF recovery day

Monday July 25

Past 24 hours

  • Data taking on empty target, approx 2.7 B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • Switch to full target running after the RC meeting


Sunday July 24

Past 24 hours

  • Data taking on empty target, approx 2.8 B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • Continue taking data on empty target until Monday morning.

Saturday July 23

Past 24 hours

  • Data taking on empty target, approx 2.7 B triggers in the past 24 hours

Shift Reports

Reports

Plans

  • In discussions Friday after the RC meeting it was decided to continue data taking on empty target until Monday morning. Then switch to full target.

Friday July 22

Past 24 hours

  • Data taking on empty target, approx 2.1 B triggers in the past 24 hours
  • Priority for beam delivery shifts to Hall D today

Shift Reports

Reports

Plans

  • Continue data taking on empty target until ~ 17:00 today, then switch to full target for running over the weekend

Thursday July 21

Past 24 hours

  • ROCFDC11 Slot 19 FADC125 (possibly?) repaired
  • Solenoid final ramp to 1350 A ~ 5:00 AM
  • Beam returns ~ 5:00 AM
  • Harp scans
  • Start data taking on empty target ~ 6:00 AM

Shift Reports

Reports

Plans

  • Continue data taking on empty target